Overhead or underground power: which is right for your Central Coast property?
Cheaper and quicker versus tidier and storm-proof. How to decide, and what each option costs on the Coast.
Read the guide →Mains too small for the loads you're adding? We replace and upgrade consumer mains across the Central Coast, overhead or underground.

Consumer mains are the cables between the point of attachment on your pole or pit and your main switchboard. In Central Coast homes built before the early 90s these are often undersized 6mm or 10mm cables that can't safely handle modern loads - EV charging, ducted air-conditioning, pools, and solar export. Replacing them is Level 2 ASP work.
We measure existing cable size, run, attachment condition and load requirements.
Together we decide whether to stay overhead or go underground - we'll cover the pros and cons on site.
Fixed quote covering cable, brackets, trenching if UD, testing and notifications.
New mains run, terminated at the POA and the switchboard, with temporary supply if needed.
Tested, energised via Ausgrid and certified with your CCEW.
NOSW + EWR lodged with Ausgrid, CCEW issued, plus any required Notice of Suspected Defect cleared.
We deliver consumer mains upgrade to homes, builders and commercial properties across the Central Coast. From Peninsula suburbs like Woy Woy and Umina through the Gosford CBD, Erina and the beaches, up to the Lakes district and Budgewoi.
See some of our most common service areas:

Cheaper and quicker versus tidier and storm-proof. How to decide, and what each option costs on the Coast.
Read the guide →
Usually not. The honest breakdown of when single phase is fine, when it is not, and what a three-phase upgrade involves.
Read the guide →
Plan for these before the builder starts and you avoid the classic mid-reno stall waiting for a Level 2.
Read the guide →New meter required? Solar export locked out? We do smart meter installs across the Coast - usually within 5 business day
Learn moreOld fuse board, nuisance tripping, adding solar or EV? We upgrade Central Coast switchboards to full RCD compliance.
Learn moreNeed more grunt? We upgrade Central Coast homes and workshops from single phase to three phase, including the full meter
Learn moreCall directly or send a photo of your defect notice, pole or switchboard for a fast indicative quote.