Received an Ausgrid defect notice? What it means and what to do next
How to read the notice, how long you have, what the common defects are, and how to get it cleared without drama.
Read the guide →Line sagging over a driveway? POA bracket pulled away from the eaves? We repair points of attachment across the Coast, fast.

The point of attachment (POA) is where Ausgrid's service line meets your property. Loose brackets, perished insulators, cracked eaves and low-sag cables are the most common Ausgrid defect notice reasons we see. This is Level 2 ASP work and usually a 2-3 hour job.
On-site assessment of the POA, cable condition and clearances.
Fixed price for bracket renewal, re-sag, insulator replacement or POA relocation.
EWP access, POA repaired, cable re-terminated, clearances verified.
CCEW and defect close-out with Ausgrid.
Clearances per AS/NZS 7000, CCEW, Ausgrid defect close-out.
We deliver point of attachment repairs / re-sag to homes, builders and commercial properties across the Central Coast. From Peninsula suburbs like Woy Woy and Umina through the Gosford CBD, Erina and the beaches, up to the Lakes district and Budgewoi.
See some of our most common service areas:

How to read the notice, how long you have, what the common defects are, and how to get it cleared without drama.
Read the guide →
You are, from the point of supply onward. Where that point is and what it includes.
Read the answer →Sagging service line? Tree on the line after a storm? New overhead connection? We install, repair and re-tension service
Learn moreRed, yellow or blue sticker from Ausgrid? We rectify defects fast - usually within 21 days, often within the week. Licen
Learn moreAusgrid defect notice? Storm damage? A leaning pole you're worried about? We replace private poles across the Coast - of
Learn moreCall directly or send a photo of your defect notice, pole or switchboard for a fast indicative quote.