24/7 emergency response across the Central Coast
ASP Level 2 · Fully accredited · 0439 064 282
📞 Call 0439 064 282 Get a Free Quote
⚡ 24/7 Emergency

Ausgrid Level 2 ASP · Fully licensed & insured
admin@anacondaelectrical.com.au

Level 2 ASP service

Metering Upgrades & Single-to-Three-Phase on the Central Coast

Need more grunt? We upgrade Central Coast homes and workshops from single phase to three phase, including the full metering change.

Metering Upgrades / 3-Phase - Level 2 electrician on the Central Coast
5.0/5 Google6 Google reviews
ASP AccreditedAll 4 Ausgrid categories
$20M LiabilityPublic liability cover
24/7 EmergencyResponse in 30-60 min
Central CoastGosford to Budgewoi

What is metering upgrades / 3-phase?

Going from single-phase to three-phase is Level 2 ASP work. It's the right call if you're adding a workshop with industrial gear, a fast EV charger, a pool with a high-draw pump, or a large ducted A/C system - and it's sometimes the only way to satisfy Ausgrid when existing single-phase mains can't cope. We handle the full scope: consumer mains, switchboard, metering and energisation.

When you need it

  • You're adding a 22kW EV charger or multiple chargers.
  • A workshop, home shed or granny flat is drawing more than single-phase can comfortably supply.
  • Ducted A/C, pool heat pumps and induction cooktops added to the same house.
  • A renovation or new build where 3-phase is being specified from day one.
  • An Ausgrid defect notice has flagged the existing mains as inadequate.

Our process

Load assessment

We calculate maximum demand based on your existing and new circuits.

Scope & quote

Typically: new 3-phase mains, new 3-phase meter, upgraded switchboard, tails, main switch.

Ausgrid notifications

NOSW + EWR lodged; your retailer coordinated for the new meter.

Changeover

2-4 hour planned outage; new mains run, new switchboard commissioned, meter installed.

Certify

Tested, energised, CCEW and metering verification issued.

What's included

  • New 3-phase consumer mains
  • Switchboard upgrade to accommodate 3-phase
  • New 3-phase smart meter
  • Balanced load distribution across phases
  • Ausgrid notifications and CCEW
Compliance & paperwork

AS/NZS 3000 load assessment, NOSW + EWR, CCEW, metering verification.

What is a CCEW and why keep it? · Why this is Level 2 work

Across the Central Coast

Metering Upgrades / 3-Phase across the Coast

We deliver metering upgrades / 3-phase to homes, builders and commercial properties across the Central Coast. From Peninsula suburbs like Woy Woy and Umina through the Gosford CBD, Erina and the beaches, up to the Lakes district and Budgewoi.

See some of our most common service areas:

Common questions

Frequently asked

Does my street have 3-phase available?
Most established Central Coast streets do. We check Ausgrid's network map before quoting, so there are no surprises.
Do I really need 3-phase for an EV charger?
Not always. A 7kW single-phase charger is fine for most households. Upgrade is usually justified when you have a 22kW charger, two EVs, or a lot of concurrent large loads.
How long will I be off power?
Typically 2-4 hours during the changeover. We aim for a single planned outage.

More questions? See all FAQs → · or ask us directly

Level 2 job on your plate? Let's sort it.

Call directly or send a photo of your defect notice, pole or switchboard for a fast indicative quote.

📞 Call 0439 064 282 Get a Quote