Smart meter installation on the Central Coast: how it works, how long it takes, what it costs
Retailer, metering provider, Level 2 electrician: who does what, and why your solar can be held up by a meter.
Read the guide →New meter required? Solar export locked out? We do smart meter installs across the Coast - usually within 5 business days of booking.

Smart meters are replacing legacy accumulation meters across NSW, either driven by your retailer, your solar installation, or because your old meter has failed. Only an Ausgrid-accredited Level 2 ASP electrician can install them. We install single-phase and three-phase smart meters across the Central Coast and liaise directly with your retailer's metering provider where needed.
Agree a 1-2 hour window with us; we lodge the metering request with your retailer.
We check your meter panel has space and is compliant; if not, we quote the upgrade at the same time.
Power off for around 30-60 minutes while we remove the old meter and install and commission the new one.
Meter energised, data handshake tested, retailer notified; you get a CCEW.
All meters installed are approved Types under AS 4777 where relevant, with full commissioning data handshakes to the metering provider and a CCEW to you.
We deliver smart meter installation to homes, builders and commercial properties across the Central Coast. From Peninsula suburbs like Woy Woy and Umina through the Gosford CBD, Erina and the beaches, up to the Lakes district and Budgewoi.
See some of our most common service areas:

Retailer, metering provider, Level 2 electrician: who does what, and why your solar can be held up by a meter.
Read the guide →
Yes. The retailer arranges it, a Level 2 installs it. What that means for timing and cost.
Read the answer →Need more grunt? We upgrade Central Coast homes and workshops from single phase to three phase, including the full meter
Learn moreOld fuse board, nuisance tripping, adding solar or EV? We upgrade Central Coast switchboards to full RCD compliance.
Learn moreWorking with a solar installer? We handle the Level 2 side - smart meter swap, switchboard and export paperwork - so you
Learn moreCall directly or send a photo of your defect notice, pole or switchboard for a fast indicative quote.