Overhead or underground power: which is right for your Central Coast property?
Cheaper and quicker versus tidier and storm-proof. How to decide, and what each option costs on the Coast.
Read the guide →New build going UD? Converting from overhead? We handle trench-to-switchboard underground power across the Central Coast.

Underground (UD) power supply is the norm for most new Central Coast subdivisions and the preferred solution where overhead is impractical - coastal sites, heritage properties, large established gardens. UD work touches the Ausgrid network, so it must be carried out by a Level 2 ASP electrician. We install UD services from the pit or pillar through to your main switchboard.
We confirm the route, pit/pillar location and trench requirements with you and your builder.
Fixed price covering trenching, cable, pit works, reinstatement and energisation.
NOSW lodged; we coordinate the pit connection date with Ausgrid.
Trench to AS/NZS 3000 depth with sand bedding and warning tape, cable drawn in, terminated at pit and switchboard.
Tested, energised, CCEW issued, trench reinstated.
AS/NZS 3000 trench depth and bedding, Ausgrid NOSW + EWR, CCEW on energisation.
We deliver underground power lines (ud) to homes, builders and commercial properties across the Central Coast. From Peninsula suburbs like Woy Woy and Umina through the Gosford CBD, Erina and the beaches, up to the Lakes district and Budgewoi.
See some of our most common service areas:

Cheaper and quicker versus tidier and storm-proof. How to decide, and what each option costs on the Coast.
Read the guide →
Get the pole in before the concreters need it. The steps, the timing and the compliance points.
Read the guide →Mains too small for the loads you're adding? We replace and upgrade consumer mains across the Central Coast, overhead or
Learn moreNew private poles for subdivisions, rebuilds, rural blocks and granny flats. Hardwood or steel, Ausgrid-compliant, insta
Learn moreSite about to kick off? We set up compliant builders poles and temporary supply across the Coast, usually within a week